CLICK HERE FOR RECORDED INFORMATIONAL MEETINGS
**VIDEO ADDRESSING GYM ADDITION**
Referendum Press Release
Upcoming Meeting Information
Tax Impact
Referendum Postcard
This past summer, the District hired Blue Design Group Architects and Miron Construction to assess the District’s buildings and grounds. They evaluated the condition of building systems, exteriors, classroom adequacy, athletic facilities, ADA accessibility, and capacity. Based on this work, projects at the Elementary, Junior High and High School have been identified for feedback in the next section of this survey.
Proposed Referendum Plan:
Upgrade building systems, address maintenance and infrastructure needs, improve classroom and educational spaces, and add secure entrances.
Although our schools are well maintained, some major building systems are approaching the end of their useful life and educational updates are needed. The proposed plan would address safety, parking, maintenance, upgrades to educational spaces, and infrastructure needs at both the Junior High and High School and the Elementary School.
Elementary School Scope
- Remodel front entrance to create a secure entryway
- Exterior door and frame replacement
Junior High/High School Scope
- Interior classroom renovations and improvements, including floors, ceilings, paint, and casework
- Restroom renovations, including new ceramic tile, plumbing fixtures, and partitions
- Upgrade heating and ventilation system in existing school, including lower level fitness center to improve air quality and humidity control, and to add air conditioning in various areas
- Exterior window and door replacements
- Construct Americans with Disabilities (ADA) accessibility improvements
- Construct a 2-court gymnasium and locker room addition
- New main entrance canopy and building signage
- Remodel existing high school gym including painting, floor refinishing, new bleachers, scoreboards, and backboards
- Replace exterior metal wall panels
- Exterior façade improvements to technical education area
- Convert bus garage into district maintenance building
- Remodel vehicle storage building and convert portion into concession stand
- Resurface existing parking lots and add additional staff, student and visitor parking spaces to improve traffic flow
|